LogoLogo
  • CloudSwitch MGPlus 48 Full PoE
  • Hardware Installation
  • Management Plane
  • Option A: Cloud Management
  • Option B: Standalone Configuration
  • Appendix
    • Technical Support
    • Compliance
    • Declaration of Conformity
    • Disclaimer/ Note
Powered by GitBook
On this page
Export as PDF

Hardware Installation

Last updated 2 years ago

CtrlK
  • Hardware Installation
  • Rack Mount
  • Power On Device

Hardware Installation

The ECS2552P can be installed on the rack. Please perform the steps to install:

Rack Mount

  1. Attach the Mounting Brackets as below and fasten the brackets using the eight Bracket Screws.

2. Secure the Mounting Brackets to the rack using the Mounting Screws.

Power On Device

Connect the Power Cord to the back of the Switch, and then plug the Power Cord into the power outlet.